Kee Systems has recently secured a contract with Carillion to design and install a handrail and fence safety solution to segregate train depot staff from the Brighton mainline.
Working directly for Carillion, Kee Systems supplied and installed Kee Klamp guardrails and 50mm x 50mm Weld Mesh Panels on the Brighton element of the Network Rail Thameslink programme.
The Weld Mesh Panels work as a trash screen to prevent litter from the train depot which subsequently affects the main railway line. The Kee Klamp guardrails also create a safety barrier of 1m from high voltage cables.
Gallery Image | Gallery Image Alt |
![]() | Kee Klamp Guardrails with weld mesh panels |
![]() | Kee Klamp Guardrails with weld mesh panels |
![]() | Kee Klamp Guardrails with weld mesh panels |
![]() | Kee Klamp Guardrails with weld mesh panels |
![]() | Kee Klamp Guardrails with weld mesh panels |
Kee Systems supplied and installed Kee Klamp guardrails and Weld Mesh Panels on the Brighton element of the Network Rail Thameslink programme.