Capital Programmes Directorate London Underground contacted Kee Systems in 2012 asking if we can assist them in designing a guardrail system which meets 0.74kN loadings for Baker Street Underground refurbishment.
Throughout 2012 and 2013 Kee Systems worked closely with Capital Programmes Directorate London Underground and provided them with technical and design support, along with site meetings witth McNealy Brown Ltd, who are the main contractor for London Underground.
In July 2013 Kee Systems was successful in winning the project to supply, deliver and install our KeeGuard Roof Edge Protection system meeting 0.74kN loadings to 6 areas within Baker Street Underground. The project was successfully completed in October 2013.
Kee Systems supplies a range of fall protection systems, including KeeGuard freestading roof edge protection, KeeGuard Topfix roof edge protection for metal roofs and KeeGuard Foldshield folding roof edge protection system. To find out more about KeeGuard roof edge protection systems visit our Fall Protection section.
Gallery Image | Gallery Image Alt |
![]() | Roof edge protection system |
![]() | Roof edge protection |
![]() | KeeGuard system |
![]() | KeeGuard roof edge protection |
![]() | Roof edge protection system |
![]() | Safety gate |
Kee Systems supplied delivered and installed our KeeGuard Roof Edge Protection system meeting 0.74kN loadings to 6 areas within Baker Street Underground, London.